INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

api 551

api 551

(OP)

I am in the middel of reading api 551, process measurement and instrumentation.there some unclear points I faced with.I needed some helps in this regard. For example in sec. 2.2.2 the last sentense is unclear.

RE: api 551

The theme of 2.2.2, Transmission Practice, is the industry practice to measure at the process and then transmit that measurement electrically or pneumatically to the control room, so that the process medium being measured, hydrocarbons, is not piped into the control room.

The last sentence of the 1993 version reads, "Insulation and heating of long lines to prevent freezing are also minimized or eliminated by the use of transmission systems."

This refers to a side benefit of pneumatic/electrical measurment signaling because pneumatic/electric signaling does not require the costs and maintenance of insulation and heat trace that piping some hydrocarbons might require.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.