How to rotate a pressure vessel at construction site prior to lifiting
How to rotate a pressure vessel at construction site prior to lifiting
(OP)
Recently we've received a 200tons pressure vessel and during the offloading phase no one consider the best way to do it. Now we're facing a small problem. The lifting lugs were positined almost facing the ground, becaming very hard to acess them for lifting the vessel from the horizontal position to vertical and than mount on the foundation. The use of rolling elements to rotate the vessel whitout lifting is not an option due to space constrains. We are considering to rotate the vessel using two nozzles on the side of the vessel. My concern is how to rotate a 200tons pressure vessel on the construction site without rollers or something like that to reduce the friction. Any one knows a procedure or have the experience in situations like that?
Bests Regards,
Diego
Bests Regards,
Diego





RE: How to rotate a pressure vessel at construction site prior to lifiting
Regards,
Mike
RE: How to rotate a pressure vessel at construction site prior to lifiting
Regards,
Diego.
RE: How to rotate a pressure vessel at construction site prior to lifiting
Regards,
Mike
RE: How to rotate a pressure vessel at construction site prior to lifiting
Upload a picture or photograph of the vessel and its current location. This will give an idea for giving the best possible solution. Also note that while lifting (or rotating) from horizontal to vertical position, the CG of the vessel will suddenly shift, this can become dangerous to the personnel and facility.
Thanks
RE: How to rotate a pressure vessel at construction site prior to lifiting
Support each set of the rollers (capacity of each chain roller varies: I've seen them between 2 tons and up to 20 tons capacity for each roller) so they themselves are supported strongly and securely (2x2 foot blocks of wood or the equal steel capacity).
"Lift" the weight of the vessel from its current cribbing up by jacking up the current cribbing (or a crane lift with spreader bars and slinbgs), and then raise the rollers so they can "catch" the load when you lower the vessel.
Make sure you don't screw up twice and raise the vessel high enough so the nozzles can rotate without hitting the ground. Or dig grooves in the ground so they can rotate freely.
With the vessel weight now on the several sets of rollers, the rollers themselves on secure, steady cribbing wide enough to stay still, the vessel can rotate with little problem. At that point, push up at any convenient point to rotate the vessel or VERY CAREFULLY "pull" with a crane to rotate. You will have more control by pushing with a single jack than pulling with a crane.
RE: How to rotate a pressure vessel at construction site prior to lifiting
Did they use the existing lifing lugs.....the ones that are now deep into the mud ?
It sounds like they simply rolled the vessel off the transport and drove away ?
Were several of the nozzle bent or flattened when the vessel rolled ?
Where in the third world are you located ?
How did they get away with this ?
Have you retained the final 10% payment until the vessel is set upon it's foundations ?