INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Saw Cuts in Slab on Grade

Saw Cuts in Slab on Grade

Saw Cuts in Slab on Grade

(OP)
How soon after pouring should saw cuts be made in a slab on grade? The slab is 4" thick and is being poured in Florida.

Thanks

RE: Saw Cuts in Slab on Grade

As soon as you can get on it without damaging the concrete. 4-8 hours.

RE: Saw Cuts in Slab on Grade

Ditto what ron9876 said.

RE: Saw Cuts in Slab on Grade


FAQ592-162: What causes random cracks in floor slabs.

Agree with both. With a 4" slab make sure thickness is tightly controlled or thickness variations will create their own control joints... otherwise known as random cracking.

See the FAQ above for more info

RE: Saw Cuts in Slab on Grade

ASAP!!!

This cannot be stressed enough.

RE: Saw Cuts in Slab on Grade

You want to get on it so early the concrete yells "OUCH".

RE: Saw Cuts in Slab on Grade

(OP)
Thanks guys.

RE: Saw Cuts in Slab on Grade

Use an "early entry" saw. with this, should be able to satrt sawcutting within about 2 hours after the completion of the floor finishing operation. Waiting 18 hours or more is too long.

RE: Saw Cuts in Slab on Grade

..and you they have to be prepared to work after hours to get on the sawcutting quickly enough...that is a big struggle to get them to do that, and may not be so necessary if it is going to be covered wth carpet or other flexible finshes,,,

RE: Saw Cuts in Slab on Grade

How do you guys specify on your drawings when the slab should be cut?

RE: Saw Cuts in Slab on Grade

4-8 hours (it depends on concrete structure, ready-mix concrete, conditions)

RE: Saw Cuts in Slab on Grade

4 hours hot-weather, 12 hours cold-weather

It’s no trick to get the answers when you have all the data. The trick is to get the answers when you only have half the data and half that is wrong and you don’t know which half - LORD KELVIN

RE: Saw Cuts in Slab on Grade

abusementpark...my spec says "Sawcut joints shall be made to a depth of at least 1/4 of the slab thickness and shall be started as soon as practicable after placement when the saw does not cause raveling of the cut edge. Sawcut joints shall be placed no longer than 8 hours after placement of the concrete and shall be made on the same day as placement."

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources