INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

WPS 3G Vertical up

WPS 3G Vertical up

WPS 3G Vertical up

(OP)
Hi can anyone advise on the following to code AWS D1.1. There have been project WPQR run and approved. I have been handed copies of the approved WPS which cover unlimited thickness & have been run in 3G Vertical up position.
Do these cover overhead & down hand positions?

RE: WPS 3G Vertical up

Yes, if the WPS states that.

Basic misconception - the PQR / WPS is to prove that filler metal "A" will successfully weld base metal "B" togather. Period. It has nothing to do with testing a welder's skill. Just that successful welds can be made using the material(s) and essential variables specified.

The welder qual - WPQ - is the skill test. For skill, a 3G [vert] weld will only qualify for 1G, 2G, and 3G. Uphill welding qualifies for uphill only. Downhand for downhand only. Overhead welding requires more, and different, skill. Thus the only way a welder can get certified for 4G [overhead] is to weld a 4G coupon.

VERY common error to confuse WPS requirements with WPQ requirements.

RE: WPS 3G Vertical up

I believe this is covered in AWS D1.1 Section 4.4 and Table 4.1 "WPS Qualification - Production Welding Positions Qualified by Plate, Pipe and Box Tube Tests".

RE: WPS 3G Vertical up

AWS is more restrictive with regards to the production positions qualified. The short answer is that each position requires a separate supporting PQR. The exception is the flat position.

Best regards - Al

RE: WPS 3G Vertical up

Al is correct.
Table 4.1 states a 3G WPS is valid for Vertical welding only,
Regards,
Kiwi

RE: WPS 3G Vertical up

Sorry,
That should read " A 3G PQR is only valid for production welding in the vertical position"
Regards,
Kiwi

RE: WPS 3G Vertical up

I 'stand' [sit?] corrected. Learning has occurred.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources