INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

SHEET PILING"JACKING"vsDRILLED SHAFT "SECANT"PILING

SHEET PILING"JACKING"vsDRILLED SHAFT "SECANT"PILING

SHEET PILING"JACKING"vsDRILLED SHAFT "SECANT"PILING

(OP)
HAS ANYONE HAD EXPERIENCE WTH OR PERFORMED COMPARATIVE VALUE ENGINEERING ANALYSIS BETWEEN DRILLED SHAFT "SECANT" PILE WALL VERSUS "JACKED" STEEL SHEET PILE WALL? BOTH HAVE TO GO 70FT AND SOILS APPEAR TO BE ACCEPTABLE TO EITHER METHOD.   

RE: SHEET PILING"JACKING"vsDRILLED SHAFT "SECANT"PILING

JROCK, what kind of info about VE are you looking for? In the final analysis it's a comparison of total project cost. Fuzzy parameters like time to install or public inconvenience during construction might apply. Life cycle cost, maintenance or aethestics might not apply depending on the project. Perhaps a difference between sheet pile and secant pile might be that your sheet pile wall would only be temporary shoring and a reinforced concrete structural lining would have to be built inside whereas you could design a secant pile wall to be both shoring and final structural lining. That would depend on what you're building.

RE: SHEET PILING"JACKING"vsDRILLED SHAFT "SECANT"PILING

JROCK - we have substantial experience in value engineering using "jacked" or "pressed in" sheet piles.
However to point you in the right direction, we would need to get more information on the specific project.
Obviously if you are looking at these two options there are vibration issues, however how close to structures will the piling line be? What is the purpose of the wall? How water tight does it have to be? How much access or right-of-way is given? Is it permanent or temporary? Also, beyond just soils, where is the water table? Are there contaminates to worry about? Is there a time factor involved?
Sorry, but these questions are relevent to adequately access the potential savings.
If you want more information you can contact the company we deal with directly through their website at: www.gikenamerica.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources