HAS ANYONE HAD EXPERIENCE WTH OR PERFORMED COMPARATIVE VALUE ENGINEERING ANALYSIS BETWEEN DRILLED SHAFT "SECANT" PILE WALL VERSUS "JACKED" STEEL SHEET PILE WALL? BOTH HAVE TO GO 70FT AND SOILS APPEAR TO BE ACCEPTABLE TO EITHER METHOD.





RE: SHEET PILING"JACKING"vsDRILLED SHAFT "SECANT"PILING
RE: SHEET PILING"JACKING"vsDRILLED SHAFT "SECANT"PILING
However to point you in the right direction, we would need to get more information on the specific project.
Obviously if you are looking at these two options there are vibration issues, however how close to structures will the piling line be? What is the purpose of the wall? How water tight does it have to be? How much access or right-of-way is given? Is it permanent or temporary? Also, beyond just soils, where is the water table? Are there contaminates to worry about? Is there a time factor involved?
Sorry, but these questions are relevent to adequately access the potential savings.
If you want more information you can contact the company we deal with directly through their website at: www.gikenamerica.com