OSHPD Cold-formed Framing
OSHPD Cold-formed Framing
(OP)
Does OSHPD have a minimum gage requirement for cold-formed steel framing?
When was the last time you drove down the highway without seeing a commercial truck hauling goods?
Download nowINTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
OSHPD Cold-formed Framing
|
RE: OSHPD Cold-formed Framing
RE: OSHPD Cold-formed Framing
I’d rather see heavier gauges than doubling studs all over the place or using a bazillion screws to anchor equipment and backing. I would not be afraid to ask the architect to specify 16 gage studs; they are fairly common in California hospitals.
RE: OSHPD Cold-formed Framing
RE: OSHPD Cold-formed Framing