INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

SOG-Lean conc instead of compacted CA-6

SOG-Lean conc instead of compacted CA-6

SOG-Lean conc instead of compacted CA-6

(OP)
Got a RFI from the contractor requesting if he can use lean concrete instead of 6" compacted CA-6 under a new slab on grade. My initial reaction was no, because I am worried about water in wet concrete. They probably would want to put vapor barrier within 7 days, so that would mean a lot of trapped water. The reason being that this is a slab replacement within an existing building and I guess its easier for the contractor to supply concrete via a chute thru a window as opposed to wheel-berrowing in gravel.

Has anyone run into this situation before?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources