I have a qualified weld procedure with impact test at -196 deg C .per B31.3 impact test is not required for austenitic steel base material but it is required for weld metal.
The consumable brand which i used for PQR qualification is same for production weld. So do i need to perform impact for each batch of consumable as the test certificate does not have any impact value?