INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Does High voltage Induction motor r

Does High voltage Induction motor r

Does High voltage Induction motor r

(OP)
Does High voltage Induction motor requires Surge immunity test in accordance with IEC 61000-4-5?

RE: Does High voltage Induction motor r

I'm not sure about IEC standards (the US standard for surge testing is IEE522).

Can you clarify whether you're asking about testing required in purchase order for new motor, or testing required in purchase order for repair/rewind of motor, or periodic test performed for monitoring?

=====================================
(2B)+(2B)' ?

RE: Does High voltage Induction motor r

(OP)
I AM ASKING ABOUT TESTING REQUIRED IN PURCHASE ORDER FOR NEW MOTOR.

RE: Does High voltage Induction motor r

In the NEMA / IEEE world, NEMA MG-1 is used for purchase of new motors.
NEMA MG-1 (2009) section 20.35 address surge withstand and testing requirements.
Users can specify motor to withstand IEEE522 surge test of either 2.0 or 3.5 pu.

There is mention that surge test can occur at various stages of manufacture:
a. On individual coils before installation in slots (65% of full test voltage)
b. On individual coils after installation in slots, prior to connection with stator slot wedging and
endwinding support systems installed (80% of full test voltage)
c. On completely wound and finished stator (100% of full test voltage).

NEMA leaves it to the customer to specify which if any of these stages testing will occur at.

Personally I would recommend at a minimum final test of completely wound stator (condition c). If the motor fails at that point, it is the financial responsibility of the supplier. If you don't test, then you run the risk that undetected weakness in turn insulation won't show up until it sees a surge in service. In fact if you don't test, there is really no teeth to "specifying" 2.0 or 3.5 p.u. surge withstand capability at all.

=====================================
(2B)+(2B)' ?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources