INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Underground Firewater pipe-No Cement lining

Underground Firewater pipe-No Cement lining

Underground Firewater pipe-No Cement lining

(OP)
Hello,

We have a situation that the contractor has installed an underground carbon steel fire water pipe that goes to a hydrant. The pipe is wrapped but it is not cement lined. I am trying to find any statement in AWWA standards (C205 maybe) that approves the pipe material.

I have already purchased AWWA C200 , C604 and NFPA 24. I couldn’t find anything in C200 and C604.
NFPA 24 allows using CS without cement lining as long as it’s internally galvanized.

Any advice would be appreciated.

RE: Underground Firewater pipe-No Cement lining

A contractor I work with, has seen carbon steel piping used as fire water supply piping at a facilty near here.
The lines were installed in the late 80's and had to be replaced 2006-2008 time frame. They had actually holed through.
The reason I know about it is he could not come to my job because they were busy digging up that mess. But they did get 20+ years out of the pipe.
He did not mention the schedule. Size was 10 or 12 inch.

Regards
StoneCold

RE: Underground Firewater pipe-No Cement lining

What does your specification require?

ANSI/AWWA C200 is the standard for steel pipe.

http://www.steeltank.com/LinkClick.aspx?fileticket=Xg6aqUFFtGc%3D&tabid=94&mid=452

http://www.ives.edu.mx/bibliodigital/Ingenierias/Libros%20Ingenieria/Mecanica%20de%20los%20fluidos/Pumping%20Station%20Design%20(2nd%20Edition)/94831_04A.PDF

http://www.spiralco.com/English/Specifications/AWWA.htm

I don't think a lining is required by C200, but most specifiers will require a lining or coating of some sort.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources