INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Clearance between edge of soldier pile and rock socket

Clearance between edge of soldier pile and rock socket

Clearance between edge of soldier pile and rock socket

(OP)
Our state DOT requires a minimum of 3" clear between piles and rock sockets. We designed a permanent soldier pile wall (Non-DOT Project)utilizing W18x234 in 30" sockets - we just make the 3"

9 months into the job the contractor wants to use a 24" socket and a w14 x 283 pile. He's moaning and groaning 30" is too expensive too drill - My opinion - you bid it, you bought it. Meanwhile, his proposal would only allow for about 1 1/2" clear distance.

I was wondering what minimum clearance others require.

Thanks

RE: Clearance between edge of soldier pile and rock socket

In my opinion, rock sockets need only be large enough to fit the pile assuming the necessary vertical and lateral capacity are provided. Any size concrete-filled hole large enough to fit the pile will provide sufficient concrete cover over the faces of the flanges and web for corrosion protection.

RE: Clearance between edge of soldier pile and rock socket

(OP)
Thanks. I'm going to do some research. I don't want to be a hard @$$ but... It looks like he bid the job and now he's figuring out how much it will cost.

RE: Clearance between edge of soldier pile and rock socket

Fundamentally, what is the reason behind the DOT requirements? Is it because they want to minimize corrosion by having "additional cover"? or is it because they want a greater distributed bearing area to distribute the load better over the rock? Answer the questions out serviceability and strength and I think you'll find a solution.

RE: Clearance between edge of soldier pile and rock socket

(OP)
Good points InDepth. I think quite often we arbitrarily accept things.

RE: Clearance between edge of soldier pile and rock socket

"I think quite often we arbitrarily accept things."
This is the incorrect way to 'Engineer' yet we are all subjected to it because of the Standard Specifications followed by larger 'entities'. Every once in a while I feel like I have gone back to my childhood when an architect has pulled out something out of his files.

"Answer the questions out serviceability and strength and I think you'll find a solution." This is the way to 'Engineer'.

RE: Clearance between edge of soldier pile and rock socket

With 3" clear and a decent slump the concrete had a good chance of flowing around in front of the flange and filling the hole. With 1.5" clear I am doubtful that will happen regardless of how the contractor places the concrete. I would stick with the 3" clear

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources