Smart questions
Smart answers
Smart people
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Member Login

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips now!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

Join Eng-Tips
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

LINK TO THIS FORUM!

Add Stickiness To Your Site By Linking To This Professionally Managed Technical Forum.
Just copy and paste the
code below into your site.

Partner With Us!

"Best Of Breed" Forums Add Stickiness To Your Site
Partner Button
(Download This Button Today!)

Feedback

"...I can't start my day without this site!..."

Geography

Where in the world do Eng-Tips members come from?
kareng (Structural)
10 May 12 13:50

Hi all,

I have an existing 3" steel composite deck with 4" concrete (7" total) then an additional 3.5" concrete topping, 1.5" setting bed and 4" of pavers that is an exterior plaza over a parking garage. The deck is supported by steel beams 9'-0" o.c. with shear studs, and there is no reinforcement in the slab. (There is likely WWF but who knows where in the depth) I need to calculate the allowable concentrated wheel load on the plaza for large trucks, forklifts and other equipment to be driven on top. I've determined that the beams and connections do not control - the slab does. I'm using the SDI procedure published in the 1997 Composite Deck Design Handbook to calculate the capacity of the deck. This procedure uses PL/4 to calculate moment on the slab due to the concentrated load. I have a few questions:

1. Is it viable to distribute the wheel load in the direction of the span at a 45 degree angle through the pavers/setting bed/topping to get a short distributed load instead? This lowers my moment and gives a bit more capacity, but since the procedure includes a topping I'm wondering if it's already incorporated. I'd ask SDI but they are apparently closed for the week!

2. I am planning to use a dynamic load factor of 1.2 for the moving vehicles, but I haven't found a lot of information to back this up. ASCE has 1.2 for machinery, AASHTO 1.3 for bridges. Is there a dynamic load factor for slow-moving vehicles?

3. Does anyone know of any other good references that can be used for this calculation?

Thanks!
KarenG

cap4000 (Civil/Environmental)
10 May 12 15:57

Check out this link below I recently used. The forklift example is under under the Deck section.

http://www.canam-steeljoists.ws/www/v4/epublica.nsf/fa_listepubseg?openform&pub=technical&frame=ecanams

MiketheEngineer (Structural)
10 May 12 16:19

If this temporary - think about shoring it - NO PROBLEMS!!

kareng (Structural)
11 May 12 6:16

Yep the Canam Deck example is the same as the SDI procedure. Some good references on this page though. Thanks~ Unfortunately not temporary. They want to know what they can drive out there without shoring.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close