INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Guy Tower Anchor Block Modification

Guy Tower Anchor Block Modification

Guy Tower Anchor Block Modification

(OP)

Hello all,

This is my first post on this board. I am working for a company that analyzes telecommunications towers. They have asked me to design modifications for a guyed tower anchor block. The contractor that will be performing the modifications can be very difficult so I am sure if I just give one solution another alternative will be requested. What different methods are there for modifying an existing guy anchor block for the capacity required from the addition of antennas?

Thank you all for your time.

RE: Guy Tower Anchor Block Modification

see NAVFAC DM 7.2 for standard anchor block design.

RE: Guy Tower Anchor Block Modification

There is a specific software program out there - just for doing this. Don't know much about it or even its name But I an sure "Google" can find it.

RE: Guy Tower Anchor Block Modification

Make sure the anchor rod is not the limiting factor. Use dowels to tie the new concrete to the existing. Increase the width and hight as needed.

RE: Guy Tower Anchor Block Modification

The main thing is don't mess up what you already have. Remembering that you still have a load to resist (maybe not the max), so I'd set up a few rules that the contractor must follow. For instance: no disturbance to any earth in front of the existing block, or even adjacent to that earth. You might even require a temporary supplemental anchorage, such as helical anchors as a safety feature. My main concern would be my usual statement "In construction, if it could be done wrong, it will be". With cable clamps, make sure they don't put them on wrong.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources