INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Accounting for countersinking in culverts in HY8

Accounting for countersinking in culverts in HY8

Accounting for countersinking in culverts in HY8

(OP)
I need to determine the diameter of a proposed culvert for a given roadside ditch. In HY-8, how do I account for counter-sinking of culverts below stream bed:
a) inlet to 40% of diameter,
b) outlet to 20% of diameter

Thanks

RE: Accounting for countersinking in culverts in HY8

do you mean a drop inlet? or buried invert?

RE: Accounting for countersinking in culverts in HY8

(OP)
Also, out of curiosity - does sinking the barrel as shown in the link I have in my last post do something for culvert anchoring (i.e., uplift force @ inlet), or is the surcharge weight insignificant?
Speaking of anchoring, is there any standard drawing for just a toe plate anchoring for culvert ends (not as part of a headwall arrangement)?

RE: Accounting for countersinking in culverts in HY8

Do you have the latest version of HY-8? In 7.2, it's called "embedment depth."

It's measured in inches, and assumed to be constant, not more at the inlet than outlet like you mentioned. Maybe you could check for inlet control at 40%, and outlet control at 20%, and use the worst case.

RE: Accounting for countersinking in culverts in HY8

At 100 lb/ft^3 or more, I'd assume you'd get a lot of ballast from the fill.

On the other hand, my state has had four 100-year events in 16 years. Maybe you should assume a storm has blown all the fill out as a worst case.

NYSDOT has a sheet showing toeplate extensions on end sections. Does this help?

https://www.dot.ny.gov/main/business-center/engineering/cadd-info/drawings/standard-sheets-us-repository/603-02.pdf

 

RE: Accounting for countersinking in culverts in HY8

the photo in the link seems to show little or no cover over the culvert. without headwalls, pre-fab end sections or anchors, the culvert is at risk of movement during a large flood. this is a poor design to copy. I agree that during a large flow, the material in the bottom of the pipe will be scoured out due to high velocities in the culvert and you will have no ballast.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources