Brentwood Storm Tank - model when staked
Brentwood Storm Tank - model when staked
(OP)
Does anyone have a suggestion on how to model the Brentwood StormTank when placing them in a staked configuration?
I am trying to model two - 36" high units.
I'm using HydroCAD 9.10
I am trying to model two - 36" high units.
I'm using HydroCAD 9.10





RE: Brentwood Storm Tank - model when staked
Otherwise, you can use manual embedding:
1) Define the overall excavation volume.
2) Create the chamber storage for the lower chambers and set the embedding.
3) Create the upper chamber storage and set the same embedding.
Peter Smart
HydroCAD Software
www.hydrocad.net
RE: Brentwood Storm Tank - model when staked