Riser Teck Vertical Suspension Banding In Place
Riser Teck Vertical Suspension Banding In Place
(OP)
Manufactures advise the maximum self support length and or pulling tension details for this type of cable pulled vertically up by its phase conductors. I have not found any information on the vertical support intervals once pulled. It's become a standard in the mining industry to band the outer to a bracket at some interval. This banding supposedly compresses the armour enough to secure the conductors within. Seems that a few assumptions are made as to the tension applied by the banding used and to the compressive abilities of the armour to secure the conductors. Would someone have come across any information on the vertical support requirements & means for Riser Teck?
Our application is for 200 meter vertical with a total of 20 meters running horizontally.
Thanks
Our application is for 200 meter vertical with a total of 20 meters running horizontally.
Thanks





RE: Riser Teck Vertical Suspension Banding In Place
"Electric Power & Transmission & Distribution"
Keith Cress
kcress - http://www.flaminsystems.com
RE: Riser Teck Vertical Suspension Banding In Place
Bill
--------------------
"Why not the best?"
Jimmy Carter
RE: Riser Teck Vertical Suspension Banding In Place
RE: Riser Teck Vertical Suspension Banding In Place
http://eng-tips.com/viewthread.cfm?qid=319031
Good on ya,
Goober Dave
Haven't see the forum policies? Do so now: Forum Policies