INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cracked or uncracked capacities of Simpson STHD hold downs?

Cracked or uncracked capacities of Simpson STHD hold downs?

Cracked or uncracked capacities of Simpson STHD hold downs?

(OP)
In the 2011 Simpson catalog, where it lists the capacities of LSTHD/STHD hold downs, there are values under cracked that are in most cases lower than the values under uncracked.

Is this related to seismic governing, or what? Exactly what determines cracked or uncracked?   

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

Without actually looking at the catalog I suspect it the same as ACI318 App D.  Basically if the region where the anchor is located would be expected to have cracking at service loads (top of a beam over a column, or bottom of a beam at mid-span for example) then you use cracked.  If it is no expected to have cracks that you use uncracked.  Often a judgement call IMO.
 

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

(OP)
I have no idea how to determine cracked or uncracked in a PT slab on grade, nor a conventional concrete wall footing.

Does anyone ever do such an analysis?

I am also assuming the above applies to both wind and seismic (I don't have recent AC318)  

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

For conventional reinforced concrete, I think you ignore the reinforcing steel, then check your cracking moment based the modulus of rupture...if Mcrack < Mapplied, then you have a cracked section.

For a PT slab, maybe you add your PT stress to the modulus of rupture? Not sure though...

Would you count hairline cracks from shrinkage as 'cracked concrete'? If that was the case wouldn't you always have to assume a cracked section?

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

(OP)
CANEIT,

I still don't know because what would be a rational analysis of actual bending moment in a continuous concrete wall footing and stem?

The footing is bearing on soil so that in the case of uniform load, then there would be no moment in the stem?

Where beams or girder trusses are putting a heavy concentrated load on the stem, how could it be practical to analyze all that, plus it is bearing on soil, which is to me a difficult support condition to analyze.
  

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

(OP)
OK, I will use the cracked values to avoid all the complications.

The highest-rated hold down (STHD14) has the same values for both cracked and uncracked, so it won't be a bother to downgrade the lesser hold downs.

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

Easiest answer - call Simpson at 800-999-5099 and ask to speak to their technical department.  Those are a bunch of smart folks there, and if they don't immediately know the answer, they'll get you to an engineer that does.

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

Like Slta said - pick up that 2 ton phone and call Simpson.  They are very helpful!!

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

(OP)
OK I just called Simpson. They said the cracked/uncracked is a Code requirement for high seismic areas, otherwise it is OK to use uncracked values.  

RE: Cracked or uncracked capacities of Simpson STHD hold downs?

My guess - go back to the 50% downgrade of sheetrock shear walls for seismic events - and the idea that after the first event, the wall is likely to be weakened.

I suggest that the cracked values are values that can be relied on after a seismic event of a certain level.  But as to what that level is, 6 or 7, you would have to call Simpson as suggested.

Mike McCann
MMC Engineering
http://mmcengineering.tripod.com
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources