INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Post Weld Heat Treatement Requirement in ASME IX

Post Weld Heat Treatement Requirement in ASME IX

Post Weld Heat Treatement Requirement in ASME IX

(OP)
Hi;
Actualy we are working on a WPS for an isolating joint wich have a material with P Number P1 and thickness up to 31.75 mm. Due to welding temperature (250°C)we did not specify a Post Weld Heat Treatement.
We want to know if PWHT requirement is indicated in ASME IX or another standard.
Regards.

RE: Post Weld Heat Treatement Requirement in ASME IX

The requirement for PWHT of the involved weld is not in ASME IX. It will be in some other Code; e.g., B31.1, B31.3, B3.4, B31.8, ASME I, ASME VIII, etc. If the design/construction Code were  ASME VIII, Div.1, your weld would be exempt from PWHT.  

RE: Post Weld Heat Treatement Requirement in ASME IX

BFZHA, it depends on your piping code, what kind of facility are you building and to what code?

As much as possible, do it right the first time...

RE: Post Weld Heat Treatement Requirement in ASME IX

(OP)
Thanks for your reply,
The piping code is ASME B31.8 and ASME VIII Div.1.
 

RE: Post Weld Heat Treatement Requirement in ASME IX

It may also depend on the fluid service.  Requirements for sour service may dictate that PWHT is required if the hardness maxima cannot be achieved without it.

Steve Jones
Materials & Corrosion Engineer

http://www.linkedin.com/pub/8/83b/b04
 

RE: Post Weld Heat Treatement Requirement in ASME IX

Assuming that PWHT is not required for service as per SJones, PWHT is not required per 825.2 od B31.8. If T exceeds 31.75mm (1 1/4"), PWHT is required.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources