INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete beam expansion joint

Concrete beam expansion joint

Concrete beam expansion joint

(OP)
I am designing foundations and concrete ground beam for a pre-fabricated steel structure ( single story 40m x120m), the beam is 0.6m high and should support a hollow block cement wall,  3m high , the upper 0.2m of the beam is above ground level
 my question is about the expansion joint , the spacing isn't the issue , the issue is the detailing of the expansion joint, is splitting the ground beam with shared foundation is enough or it requires splitting both the beam and foundation.    

RE: Concrete beam expansion joint

Usually split the beam - but leave the foundation together.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources