INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

pressures from box culvert to pipes

pressures from box culvert to pipes

pressures from box culvert to pipes

(OP)
Hi I'm a civil engineer with basic knowledge in foundation designs.I hope to have a view on the analysis of this condition.

We will be laying a  concrete culvert 1.5 m below ground level with pipes laid inside and is about 100meters length. Parallel to it, is a 20" diameter steel pipe laid in the ground 0.3meter beside the culvert edge and .35meter under the culvert edge.

Would someone help me on how to calculate the load or pressure from the culvert's edge to the pipe and will these loads/pressure reach the pipe, considering the short distances between them?  

RE: pressures from box culvert to pipes

Are there 2 20" pipes? one .3 m from edge of culvert and one half way under the culvert?  Give us all the sizes and invert elevations.  what is in all these pipes?  Move your culvert 3 meters from the other pipes.

Richard A. Cornelius, P.E.
WWW.amlinereast.com

RE: pressures from box culvert to pipes

(OP)
Thanks for the reply.

I have attached a section detail in my first thread. Thickness of the soil above the culvert s approx. 0.5 m, thickness of culvert's walls and base are 0.25m. 2 20" and 2 18" (oil) pipes are inside the RC culvert. In the attachment a pipe outside the culvert is parallel to the culvert at 0.328m away horizontally from the culverts edge of base and 0.358m bottom of the same edge. It could not be moved any farther because of the pipeline corridor space limit.

I have read about the 2:1 approximation (Boussinesq equation on how to get the vertical stress under foundations and how far its pressure would reach. Once I get the stress under the culvert and how far it is, I'll just check the stress capacity of the pipe and done. Am I having a right solution for it?

  

RE: pressures from box culvert to pipes

That should do it.

Richard A. Cornelius, P.E.
WWW.amlinereast.com

RE: pressures from box culvert to pipes

Stress distribution is only one concern.  You need to look at the global stability including settlement, bearing pressures, construction stages, surcharges and stress distribution. We don't know what is buried underneath either.  Get yourself an experienced local geotechnical firm.

RE: pressures from box culvert to pipes

(OP)
Thanks for the comments!!

 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources