INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Ground anchors with tieback wall design

Ground anchors with tieback wall design

Ground anchors with tieback wall design

(OP)
I am working on a 21 foot(above ground surface) tall solider pile wall with tieback anchors. The wall will support 3 concrete tier walls. I considered my first anchor location at 10 feet from the top of the soldier pile. After the completion of hand calculations, I ran a global stability program to check the global stability of the wall system. I got a factor of safety less than 1.25 and the failure slip circle pass through above the anchor location. Then, I moved my anchor up, to 5 feet. Now, I got FS greater than 1.5. But, the factor of safety against passive failure of the retained soil above the anchor was decreased to less than 1.5. Can somebody give me an idea to fix this issue? I used a friction angle of 28 degrees for retained soil.

I really appreciate for our time.

Thanks

RE: Ground anchors with tieback wall design

Have you considered making the soldier beam spacing smaller? You haven't mentioned which of 3 upper walls are surcharging the tieback wall.  Also since it is multilevel anchor, have you checked for the various construction stages?  A cross section with distance and section sizes will help.

RE: Ground anchors with tieback wall design

Sketch helps a lot.  Looks like the lower two walls are surcharging the tieback wall. (18 ft setback < 21 ft wall height).  You will need to determine the lateral stress of the lower two walls independently ( treat each wall as a strip load)and add it to your active earth pressure.  You may consider making the wall a two level anchor to reduce your soldier beam size, equalize your -ve/+ve moments and control your deflection.  You may also consider a tangent pile wall that is tied back, it is a more rigid system.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources