INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Environmental Assessment vs. Impact Statement

Environmental Assessment vs. Impact Statement

Environmental Assessment vs. Impact Statement

(OP)
Would someone mind explaining the difference between an Environmental Assessment (Phase 1) and an Environmental Impact Statement?

Thanks!

RE: Environmental Assessment vs. Impact Statement

Phase I Environmental Site Assessment is usually required by banks during commercial property transactions.  Basically a building inspection but aimed towards environmental issues (i.e., spills, petroleum, asbestos, etc).  There's deed research and interviews performed, as well.  This is usually a day or two in the field and the same in the office.  Review the ASTM guidelines for requirements.  

I've never done an environmental impact statement (EIS), but from my understanding, they are required during the design phase of project with sensitive areas (i.e., wetlands, oceans, lakes, etc.).  For example, Giants Stadium that was built most likely required an EIS because it was being built in the swamps. You'd probably have to do several environmental studies such as a noise, fish, bats, etc.  I've heard the budgets for EIS are 6 figures.  Not cheap and usually the owner tries to change the project to avoid drafting the EIS.    

RE: Environmental Assessment vs. Impact Statement

Environmental Impact Statements are a result of the National Environmental Protection Act (NEPA) and are required whenever federal money is spent. Then there are a bunch of special cases (Categorical Exclusions) and situations where an Environmental Assessment is all that is necessary (no significant impacts). Unless the Giants Stadium was built with federal money, an EIS was most likely not required. However, the city of San Francisco would've required rigorous studies in the planning process, and lots of public participation, akin to that which happens during an EIS.

RE: Environmental Assessment vs. Impact Statement

One difference between the two is that an Environmental Site Assessment is a "statement of condition" of the environmental aspects of a site. It is usually geared to those sites that either produce something that could have an effect on the localized environment or site that uses products that have an effect on the localized environment.  It is an indicator of the potential of a given site to affect, through contamination, adjacent contiguous sites.

An Environmental Impact Statement is an assessment, typically for the influence of a large site or multiple site development on its neighbors or the region and incorporates things such as the impact of a development on the efficacy of the surrounding green areas, wildlife, quality of life, downstream runoff and other direct environmental impact.

RE: Environmental Assessment vs. Impact Statement

"I've heard the budgets for EIS are 6 figures" - That sounds like a bargain. I've heard that the EIS for the Tappann Zee Bridge in NY is approaching NINE figures.

RE: Environmental Assessment vs. Impact Statement

An EA or EIS is required when federal approval (not $) is required for construction of a project.  The determination of whether an EA or EIS is needed is made by the Federal Agency (or the courts) in "lead" over the decision to approve a project.  An EA is for relatively simple situations, and the Federal agency in charge can issue a FONSI at an EA level.  If however, the project is larger, or more controversial, then an EIS may be required.  Note that an EIS in itself doesn't stop a project, and the law just requires the Fereral agency to recognise the impacts before approving a project.  On the other hand, the lawsuits that accompany accusations of incomplete or faulty EIS preparation can make progress really really slow.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources