INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Private roadway bridge over body of water.

Private roadway bridge over body of water.

Private roadway bridge over body of water.

(OP)
I will have to first mention that this is a private job on my own property but this is a bit outside my area of expertise and looking for standards and data to educate a bit for this as well as get opinions for experienced engineers in the field.

We are building a large pond with a dirt bridge crossing.  Crossing will be approx 40-50ft long and 30ft wide.  We will basically excavate the entire pond, then install flow pipes to communicate water flow from one side to the other, then back fill to create the crossing area.  

I am not sure of what considerations to take regarding load ability of the crossing.  I need to decide if PVC pipe is adequate under the crossing or if concrete will be needed.  

Soil - sandy loam top, sandy clay under layer.  
Max load - 150klb truck load.  Not sure if need to break down to psi compression load.  
Tube size -  2x, 30-40"
Tube set depth - 6ft
pond depth - 8ft


I realize this is a bit "vague" in data but looking for an overall opinion on the matter I guess.   

RE: Private roadway bridge over body of water.

PVC would not be my first choice for a culvert of this size. HDPE, RCP or CMP would be first choices.  

RE: Private roadway bridge over body of water.

(OP)
CMP would be an option but I have concern for long term life being submerged.  RCP is my first choice but expense of that will kill this project just being a private project.  I can work with a few different sizes but RCP is not typically found as surplus...

I mentioned PVC because we might have some removed C900 municipal water pipe  laying around.  They build highways over the stuff but this is a rather different application.  I am just trying to arrive as compressive loads to determine if there is any suitability for PVC.  

I may also be able to use smaller pipes.  My target dimension is simply to reduce silt sealing concerns but I suppose some floable fill or something around the entrance could probably help.   

RE: Private roadway bridge over body of water.

what is your 150klb truck?

RE: Private roadway bridge over body of water.

(OP)
Bridgebuilder, thanks for the link.  I will take a look.

CVG, estimated truck load is just a worst case with margin.  I am estimating an 80K lb freight load on an 18 wheeler.  Crossing will see occasional truck traffic.  We will have several concrete trucks crossing for a big concrete floor.  probably 30 trucks at 80klbs each.  Good test for the crossing I guess.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources