INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Test Sep Shutdown Logic

Test Sep Shutdown Logic

Test Sep Shutdown Logic

(OP)
For test separator ESD logic on an offshore platform where the test separator is supplied directly from wells via a dedicated Test Manifold:

1. Should a high pressure in the test sep isolate the tested well in addition to isolating the inlet ESDV.

2. If yes to q 1, how can this be done given that only one well at a time will flow to the test separator and it is undesirable to simply shutdown all producing wells for a test separator upset.

Thanks.  

RE: Test Sep Shutdown Logic

Dear ChemEngSquirrel,

-a high pressure in the test sep shouldn't isolate the tested well
 unless the well is protected by HIPPS "high-integrity pressure    
 protection system".
-for a high pressure signal activated on test separator, the PCV  
 should open gradually till reaches wide open then, the PSV should  
 opens.

I wish i May helped you!! :)  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources