INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Grouting Shear Lug

Grouting Shear Lug

Grouting Shear Lug

(OP)
Looking for details for putting hole in base plate for grouting of a shear lug.

I thought AISC had some typical details for this.

Other question is, it is possible to just pour the grout and wet set the column?
In my situation the column is really not a column but just a weldment used for a crane stop

RE: Grouting Shear Lug

Related documents...

http://www.aisc.org/uploadedFiles/Research/Research_Reports/Kanvinde%20-%20Shear%20Transfer%20in%20Exposed%20Column%20Base%20Plates.pdf

http://ecourses.vtu.ac.in/nptel/courses/Webcourse-contents/IIT-MADRAS/Desi_Stee_Stru1/cntwordfiles/8%20columnbase/pdf%20files/4%20plate%20with%20shear%20&%20anchor%20bolts.pdf

It seems the usual approach uses to be just set the baseplate in the preformed hole; with a shear lug, quite likely a wet set will be preferred for a better fill , without shear lug quite likely a dry set of the plate allows for better levelling. Precisely on levelling issue, setting the column with baseplate -as long as feasible to keep the correct position- could be good, but may be impractical.

In all cases, it is common to use specialty mortars with small shrinkage.

 

RE: Grouting Shear Lug

I would hesitate to wet set the base pl if the col is attached for the following reasons:
the possible need to plumb the col
the possible need to adjust the elevation
after all members are connected to col...may have to come back and readjust the above.
All of this involves time while the grout is meanwhile beginning to set.
In an ideal world it could be possible.
Attached is an example of base pl details that I have used.
Can not remember where I got the 1 1/2" dia holes for the grout..
have done many like this...no complaints sofar.  

RE: Grouting Shear Lug

(OP)
Sail-
Like I mentioned, this is not really a column.

In your sketch, it looks like you must have a very large grout pocket.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources