INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Metallurgical Damage from Weld Repairs
2

Metallurgical Damage from Weld Repairs

Metallurgical Damage from Weld Repairs

(OP)
How many weld repairs is one allowed to do on a pipe butt weld? I'm talking about cutting and welding the same buttweld more than once.

RE: Metallurgical Damage from Weld Repairs

Not sure, but if you completely remove all prior weld and HAZ and ensure the parent metal is not overtempered during  the multiple PWHT processes ( by adding thermocouples directly under the induction heating coils) I think at least 3 weld cycles could be allowed.

If you do not remove all weld metal and HAZ metal, then the remnant HAZ becomes "reheated" and add'l carbide precipitation or aging occurs to the old HAZ and adjacent material- if the region that is over-aged extends beyond perhaps 2t ( t= wall thickness) then there may be concern that type IV creep damage  would impact the life of the joint( I'm assuming we are talking about operating above 800 F).  

 The axial stress imposed on a butt weld is only 50% of the circumferential stress that the parent metal is exposed to, so the ( 50% )  weaker butt weld HAZ is normally permitted under the assumption that  the damaged HAZ is thin- but once the damage or aged material exceeds a significant fraction of the wall thickness , then that assumption might not be valid.  

A larger issue with the newer materials ( P91 et al)is that the PWHT that occurred prior to circa 2009 likely  did not include monitoring thermocouples directly under the induction heating coil- that zone may have been overtempered. It has since been found that the temperature difference between the under-coil zone and the weld zone thermocouples could be as much as 100F- it is roughly proportional to the rate of pipe heat up ( F/min) times the square of the distance between the monitoring t/c's and  the center of the induction coil zone.  If you make that same mistake multiple times, it doesn't get better.

RE: Metallurgical Damage from Weld Repairs

2

Quote:

How many weld repairs is one allowed to do on a pipe butt weld? I'm talking about cutting and welding the same buttweld more than once.

First off, there is no 'fixed' number or rule of thumb. The simple answer is it depends on the base material and if post weld heat treatment (PWHT) is required. For carbon steel with no PWHT requirement, you can weld repair as many times as necessary.

For other materials that are higher alloy,  heat treated and air hardenable you need to qualify a weld procedure with some idea as to the number of PWHT cycles one would anticipate during fabrication and service. This way you can evaluate the weld region and base material based on 'x' number of total PWHT cycles. Again, there is no magic number of times, and you will not find this in most Codes and Standards.
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.