Shoring removal and compaction
Shoring removal and compaction
(OP)
My roadway is being constructed in a fill embankment. Construction sequence is proposed to construct half width at a time. Temporary shoring is proposed to protect the embanked roadway (12' higher than existing). While doing the second half how would the required compaction at/near the shoring attained and how is that shoring pulled out? Do anyone share their experience?
Thanks
proposed roadway
-------------------
|
|
|<----- Temporary shoring
|
|
| existing roadway
------------------------
Thanks
proposed roadway
-------------------
|
|
|<----- Temporary shoring
|
|
| existing roadway
------------------------





RE: Shoring removal and compaction
RE: Shoring removal and compaction
You don't always need to remove soldier beams and lagging. This type of sheeting is often abandoned in place, especially for jobs like this with staged construction. If you use sheet piling, you probably will want to extract the sheets when the embankment fill on the front of the wall eventually reaches finished grade.