INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Zeron 100 maximum deformation
2

Zeron 100 maximum deformation

Zeron 100 maximum deformation

(OP)
Dear all,

I want to reduce Zeron100.

How much can I reduce it ?
I guess a 25% is normal but how do I calculate the maximum reduction?

I guess maximum reduction may be the max force your tools can apply but assuming I got beefy tools.. how much reduction until my material gives away?

Now what does give away mean? I guess depends on application. Let's say that at this point all I care is not cracking it and secondary salt spray corrosion at 100F temp.

Thanks,

Herc

RE: Zeron 100 maximum deformation

Herc,

Do you mean tube reducing?  Or thickness reducing by cold rolling?

RE: Zeron 100 maximum deformation

(OP)
Tube reducing by spin forming.
You think I can extract a tensile bar from a SCH 40 SS?

RE: Zeron 100 maximum deformation

Schedule 40 of what tube size??????

RE: Zeron 100 maximum deformation

If the work is compressive then 50% reduction should not be a problem.
If there is tensile deformation involved then 20% may be the limit.
You will want to re-anneal before you put this into service.

= = = = = = = = = = = = = = = = = = = =
Plymouth Tube

RE: Zeron 100 maximum deformation

(OP)
Meteng, size is 2-4 in.

RE: Zeron 100 maximum deformation

Cold working limitations will be equipment driven before you reach the forming strain limit. The issue will be re-solution annealing to remove cold work and restore corrosion resistance.

RE: Zeron 100 maximum deformation

A short anneal time will work, but the quench from anneal has to be rapid.  and pickling to assure a clean surface will be critical.

= = = = = = = = = = = = = = = = = = = =
Plymouth Tube

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources