Shoring Design in Glacial Till
Shoring Design in Glacial Till
(OP)
I would appreciate a reference which can guide me for the design of above. The glacial till materials are dense and are to be excavated to a depth of 3 m. The local practice uses soil anchors and shotcrete. I would also appreciate if you tell me other shoring methods.





RE: Shoring Design in Glacial Till
RE: Shoring Design in Glacial Till
What design methods I should use to include the trafic load from the nearby road, etc. Thank you.