INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HVAC question

HVAC question

HVAC question

(OP)
In a packaging line for a pharmaceutical product.  We are going to move a wall four feet.  One room will be 4 feet longer and the second room 4 feet shorter.  It is relative easy to move the wall.  How the HVAC is affected, if affected, by the changes?   

RE: HVAC question

If your ventilation rate is based on "so many cfm per square foot of floor area" then you have changed the areas, and thus the required ventilation.

Basing ventilation on floor area is rule of thumb stuff, not engineering.

If you are moving the wall because the process in the room has changed, and there is an associated change in ventilation requirements then you will need to rebalance the HVAC.

If you are moving the wall because you are installing new equipment then the heat loads have probably changed, and you will need to rebalance the HVAC.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources