INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

UNF-56

UNF-56

(OP)
We have to quote heat exchanger. Material is SB-127.
UNF-56 does not require PWHT for this material but client requires PWHT. Question is, at what temperature should PWHT be done? what should be the holding time? if the weld nominal thickness as defined in UW-40 is 45 mm and 30 mm (we have two exchangers).
Design Code is Section VIII Division 1.
Thanks in advance.

Nasir
Welding Engineer
DESCON ENGINEERING LIMITED
PAKISTAN

RE: UNF-56

What is the base metal thickness?

RE: UNF-56

(OP)
base metal thickness is 35 mm and 40 mm same is the weld nominal thickness.

Nasir
Welding Engineer
DESCON ENGINEERING LIMITED
PAKISTAN

RE: UNF-56

Normally the variables for process defined PWHT are provided by the Clients.

If its not required as per ASME, I think you should ask your Client to provide these values or propose a plan similar to UNS N08800. He'll comment if he wants something different.


 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources