INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PROPOSED CMU WALL ABOVE EXISTING CMU WALL WITH GIRT SANDWICH

PROPOSED CMU WALL ABOVE EXISTING CMU WALL WITH GIRT SANDWICH

PROPOSED CMU WALL ABOVE EXISTING CMU WALL WITH GIRT SANDWICH

(OP)
I have an existing industrial building (pre-engineered metal building).  Inside this building is proposed an enclosed interior space (with a lower ceiling/roof) adjacent to 2 exterior walls.  The existing exterior wall is 8" cmu (#4@48")up to 7'-4" above finish floor.  Constructing a new wall immediately adjacent and interior to the existing cmu would cause sprinkler/piping headaches and would be discontinuous at steel columns.  Contractor has proposed the following (see sketch).  I would propose to find the unreinforced cells, knockout the bottom (accessible from the exterior)and install reinforcing as needed.  Drill existing purlins to allow reinforcing to pass through and continue with typical cmu wall construction.  The channel at the top of the existing wall is bolted to the metal building columns.  My concern is with the horizontal joint that would occur at the girt (don't know girt spacing).  Have I thought this through enough or have any of you any concerns?  Wind load is 90 mph, SDC=C.  Thanks for any and all replies.

RE: PROPOSED CMU WALL ABOVE EXISTING CMU WALL WITH GIRT SANDWICH

I don't think either you or the contractor has thought it through.  Just get rid of the cladding and girts, build your wall to the standard required, then reinstate cladding.

RE: PROPOSED CMU WALL ABOVE EXISTING CMU WALL WITH GIRT SANDWICH

So the girt would still take the same wind load correct, your just adding some dead load to the footing. EQ would be the only other concern and making sure the girt can take that load. not sure if yo could do a composite type thing with the CMU and the girt, would have to think a bit more about that. You could weld some tabs to the girt to anchor to the CMU. Deflection would be the other thing too with the CMU

Can you span a beam column to column in the girt space to carry the new load, and do away with the CMU idea? Footing is the weak link then.  

RE: PROPOSED CMU WALL ABOVE EXISTING CMU WALL WITH GIRT SANDWICH

(OP)
That was my first thought.  Thanks Hokie.

RE: PROPOSED CMU WALL ABOVE EXISTING CMU WALL WITH GIRT SANDWICH

Remove the girts and brace the wall against the other new walls you will be building.  Anchor the facade directly to the wall with new anchors.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources