cooper E90 box culvert
cooper E90 box culvert
(OP)
I'm doing a box culvert under the railway with ballast/subballast of 600mm above top of the culvet, AREMA part 16 gives an equation to get the dead load (attached), dose it include all Dead Load?
Thanks