Limit the end time of PondPack Hydrographs
Limit the end time of PondPack Hydrographs
(OP)
I'm routing a detention basin using PondPack and would like to be able to limit the end time of the hydrographs. I tried editing the end time in the hydrograph manager but the changes I make there have not been carrying over to my final results report.
My output shows a hydrograph extending to 2000 minutes. This creates a 10 page output.
A 60 min output hydrograph would be sufficient for my needs.
I'm using Rational Method I-D-F storms to create my hydrographs.
How do I make this change to my model??
My output shows a hydrograph extending to 2000 minutes. This creates a 10 page output.
A 60 min output hydrograph would be sufficient for my needs.
I'm using Rational Method I-D-F storms to create my hydrographs.
How do I make this change to my model??