INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

augmenting existing continuous foundation

augmenting existing continuous foundation

augmenting existing continuous foundation

(OP)
I want to augment an existing typical 10x20 continuous residential concrete foundation w/ masonry stemwall for additional loading. I am evaluating the following two approaches:

1.Pour an additional strip footing width (say 10 to 18 inches wide) w/ same thickness and at same elevation as the existing, adjacent to the existing foundation with dowels epoxied into the existing foundation. Load transfer would have to be entirely achieved through the dowel action. Any thoughts on how to quantify this? I don't think aci318 appendix d really applies here?

2.Same as #1 but provide a concrete key/lug underpin say 6"x6" under the existing foundation. The expanded foundation area would be 6" thicker and below the existing foundation and would extend 6" under the existing foundation. The idea hear is that I would be utilizing concrete shear strength for load transfer.

Any thoughts on these approaches? Any other suggestions?
 

RE: augmenting existing continuous foundation

The first thing I would suggest is to hire a Geotechnical Engineer to evaluate the situation. You don't say why you think the foundation capacity needs improving, but maybe nothing needs to be done. It's also possible that just increasing the footprint is not the most efficient way to augment your foundation capacity.
My experience with scoping Geotechnical studies is they're actually pretty cheap, especially when compared with reinforcing, concrete and labor.

RE: augmenting existing continuous foundation

I would consider underpinning with intermittent rectangular footings constructed underneath the existing continuous footing.  Spacing would be limited by the beam capacity of the existing footing/stemwall combination.  This keeps the support centered, avoiding creating moment in the stemwall.  They can probably be earth formed.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources