Smart questions
Smart answers
Smart people
Join Eng-Tips Forums
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Member Login




Remember Me
Forgot Password?
Join Us!

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips now!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

Join Eng-Tips
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.
Jobs from Indeed

Link To This Forum!

Partner Button
Add Stickiness To Your Site By Linking To This Professionally Managed Technical Forum.
Just copy and paste the
code below into your site.

sasank (Automotive) (OP)
6 Sep 02 5:39
Hallo!

Can any body explain me waht the following load cases stands for

1) 30 mph Chuckhole Vertical(Aft/Right)
2) Curb Island LF Vertical
3)Forward Wide Open Throttle
4)Forward Panic Bracking and
5) 73 degree SEPH LF Impact
GregLocock (Automotive)
8 Sep 02 19:04
They are all standard durability or special surfaces events. You will need to get your customer to define the actual geometry as they vary from company to company. here's my guess:

A chuckhole is a horrible pothole with a steel surround, in our case about 6 inches deep.

Curb Island is probably hitting and driving over a traffic island

Forward WOT - obvious

Panic brake - obvious

SEPH - don't know, PH probably stands for pot hole.

They'd be some of the loads used for a suspension design.

Like I say, contact your customer to get actual loads and descriptions of the events.

Cheers

Greg Locock

mloew (Automotive)
9 Sep 02 10:18
Sasank,

I recall the 73 degree SEPH impact as a Ford test. SEPH stands for Square Edge Pot Hole. 73 degrees is obviously not square so it might signify the angle of the edge to the direction of travel.

A Google search did not turn up anything useful. Perhaps someone at Ford can see if there is anything internally available without disclosing any secrets.

 

Best regards,

Matthew Ian Loew

GregLocock (Automotive)
9 Sep 02 18:46
Ha, well I should have thought a bit harder about that one. The potholes are deeper than the chuckholes, usually you have to do 3 passes through a pothole without wrecking the car, whereas you get get chuckholes in every cycle of rough road durability.

I repeat, you need to get your customer to define the tests, different markets use different specs. I hadn't heard of a 73 degree SEPH requirement for instance - that sounds far too easy, but it may be supposed to replicate a curb-strike event.

Cheers

Greg Locock

sasank (Automotive) (OP)
11 Sep 02 4:09
Thanks for the quick response.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!

Back To Forum

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close