Feedwater Piping
Feedwater Piping
(OP)
Hello All,
We are having a contractor replace the feedwater piping between the feedwater pumps and the boilers. The feedwater is at 200 deg. F and 200 psig.
Is schedule 40 steel pipe adequate or is schedule 80 required?
I do not have a copy of ASME B31.1 available at this time, but it is on order.
Thank you.
We are having a contractor replace the feedwater piping between the feedwater pumps and the boilers. The feedwater is at 200 deg. F and 200 psig.
Is schedule 40 steel pipe adequate or is schedule 80 required?
I do not have a copy of ASME B31.1 available at this time, but it is on order.
Thank you.





RE: Feedwater Piping
RE: Feedwater Piping
The pipe is 4-inch diameter black steel, velocity is 10 fps, corrosion allowance of 10 percent.
RE: Feedwater Piping
RE: Feedwater Piping
RE: Feedwater Piping