INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Anchorage ength of bar anchored near surface of mass concrete element

Anchorage ength of bar anchored near surface of mass concrete element

Anchorage ength of bar anchored near surface of mass concrete element

(OP)
I have question regarding anchorage length of reinforcement. To describe the scenario: I have a 1m thick concrete dividing wall sitting on the downstream incline face of a concrete dam wall. The dam is roller compacted concrete (RCC) of 15MPa. The dam wall is divided into sections with joints. The one face of this 1m wall dividing wall sits over a joint. The wall is loaded on one side (hydrostatic loads) so must be anchored into the dam wall. For 15Mpa concrete and deformed type 2 bars with fy = 460Mpa I get an anchorage length of 83 x bar diameter to develop full tensile stress in the bar. But as the bar is anchored into the face of an unreinforced mass concrete element I am not sure if this would apply. I am not concerned that the bar will fail, but the concrete could fail. I have attached a sketch that better desribes the problem. How would you calculate the anchorage length needed?

Thanks,

Seb

RE: Anchorage ength of bar anchored near surface of mass concrete element

You can use then the procedure of some code that is applicable to both mass and reinforced concrete, such EH-91 of 1991. Then examine if the development length by your current code for reinforced concrete asks for even longer development length (that probably will be the case) and then you should have something better than the acceptable condition in 1991.

Note the code was initially labeled EH-91. If the pdf is called EH-92 it is because surely includes some change and was then relabeled that way. See attachment.

Seen otherwise, the jointed face is reinforced, so you can't anymore call the concrete mass concrete (even if one understands your concern). You may use some minor mesh of reinforcement there to enhance such condition, and you mat extend some reinforcement perpendicular to it to make more reasonable the concept.

Given the place for the reinforcement, I wouldn't rely in the anchorage to concrete if holes are to be drilled; too near the joint to stay reassured of proper integrity. I should rebuild if such was the case (and feasible). Or explore the alternative of moving off-the joint etc. For anchors to mass concrete you could use the length for post-installed anchors to masonry; UBC-94 had provisions for that, current IBC should have, I assume.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources