INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hydraflow Hydrographs Extension for C3D 2009

Hydraflow Hydrographs Extension for C3D 2009

Hydraflow Hydrographs Extension for C3D 2009

(OP)
I am modeling a wetpond with two forebays, not in series.  I've read through the User's Guide and did not see how I should input my values.  If someone can provide some assistance, it would be greatly appreciated.

This is an existing pond, so I have the as-builts and created my pond with contours.  I set the bottom of the pond at the NWSE, stage 0, with the final stage being the top of the embankment around the pond.  

For culvert A out of the riser, the actual invert is lower than what I show for the pond bottom due to using NWSE.  How should I represent culvert A invert, actual invert or at NWSE?

For contour area, should I include the forebays as well?  The NWSE is higher than the berm between the forebays and main pond.

Thanks.  

 

RE: Hydraflow Hydrographs Extension for C3D 2009

If the culvert is at the bottom of a riser, your outlet is a weir at the top of the riser, not a culvert. You need to include all storage above the NWSE.  

RE: Hydraflow Hydrographs Extension for C3D 2009

(OP)
Thank you francesca.

Culvert A is the pipe out of the riser.
Culvert B is pipe into riser.
Weir A is top of riser.

Wasn't sure if I should place culvert A invert at actual invert (which would be an elevation below what I show the pond bottom to be, since I created the pond with a pond bottom at the NWSE) or input the invert into Hydraflow at the NWSE.  

For example:
actual pond bottom = 100
NWSE = 105
Culvert A out of riser invert = 100
Culvert B = 105
Top of riser 108
When I create a pond in Hydraflow, do I list the pond bottom to be 105?  If so, what should i input culvert A invert as?  Or, does it matter.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources