INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Network feeders

Network feeders

Network feeders

(OP)
Does anyone have an idea on how to calculate inrush, and cold load for a network feeder? The problem is the loads are always energized, so no events have been recorded in recent memory.

By network I mean each 480 load is served by two or three transformers, each attached to a different distribution feeder.

RE: Network feeders

Check with Coned in New York.  In 2006 they experienced a significant outage in one of their networks.  I recall reading that inrush caused some network feeder breakers to reopen.  I do not know how detailed their post event analysis was and I do not have any contacts at Coned.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources