INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Heidenhain iTNC530

Heidenhain iTNC530

Heidenhain iTNC530

(OP)
Looking for other programmers of iTNC530 .I programs  ( ISO programs )

RE: Heidenhain iTNC530

I program iTnc530......I have done ISO programs......Prefer Heidenhain code though....

RE: Heidenhain iTNC530

(OP)
I am coming from a Fanuc/Allen Bradley/GE background, so the datum table method of fixture offsets is throwing me. I would appreciate any snippets of .I programs that will illustrate how fixture offsets and probing is handled. So far, all I have seen are in CZ or German. Thanks in advance  

RE: Heidenhain iTNC530

Sorry it took so long to get back with you....
Here is a short example of using Datum Shifts

%234_45 G71 *
N5 G30 G17 X-900 Y-900 Z-20*
N10 G31 X+900 Y+900 Z+0*
N15 G247 Q339=+1*
N15 T3 G17 S2500*
N20 M3*
N25 G98 L500*
N25 G00 G90 X-70 Y+0 Z+10*
N30 G01 Z-1 F750*
N35 G01 X+70 G40*
N40 G00 Z+20*
N45 G98 L0*
N50 G247 Q339=+2*
N55 L500*
N60 G247 Q339=+3*
N65 L500*
N99999999 %234_45 G71 *


G247 Q339=+1 is like calling up G55 as your coordinate, then you can have a program set within a lbl call (G98)L?
Then you can call as many G247 Q339=2 (G56) or whatever number you assign....then call your lbl prog.....that is the simplist example..You can make a program with only datum shifts then call a sub program up in between datums shifts...several different  ways you can get it to work..
Depending on your post you can either change MCS under local to force the datum shift or edit at the machine....Here we do it at the machine set our fixture...Probe manually set every datum...but usually we never run same thing twice, being a mold shop...Hope I didn't confuse you to much....

 

RE: Heidenhain iTNC530

(OP)
iTNC530

Thanks moldmaker2011!!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources