which side should p1 face on a ct toward the bus bar or away from the bus bar ? 2/ would you short out ct secondaries when pressure testing ?
When was the last time you drove down the highway without seeing a commercial truck hauling goods?
Download nowINTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: current transformers
#2 If in doubt, short it out. :) Only 1 short is required per each multi ratio ct (X1-X5)