WF 4 and Excel
WF 4 and Excel
(OP)
I have a WF 4 file that is supposed to be linked to an Excel spreadsheet. The user provides inputs to Excel, calculations are performed, the results should drive parameters in the CAD file, Pro/E should post back results of a mass calculation, and finally a few more calculations are done and a report printed. For some reason, the files are no longer passing information back and forth. When I open the CAD file and look at the relations I get 'LOST SYMBOL' errors (see attached screenshot). How do I re-establish the link between the CAD file and the Excel sheet? I have searched through the FAQ section and past threads and found some interesting information, but not quite what I need.
To the best of my knowledge JLINK was not used.
To the best of my knowledge JLINK was not used.





RE: WF 4 and Excel
"Wildfires are dangerous, hard to control, and economically catastrophic."
Ben Loosli
RE: WF 4 and Excel
RE: WF 4 and Excel
Someone found an earlier version of the part and/or spreadsheet and the links seem to be working. I'm told it was done with External Analysis -> Excel Analysis. It looks like I can reassociate links through that dialog if it happens again.