INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Link To This Forum!

Partner Button
Add Stickiness To Your Site By Linking To This Professionally Managed Technical Forum.
Just copy and paste the
code below into your site.

Difference between KCALC and CINT command in ANSYS?

Difference between KCALC and CINT command in ANSYS?

(OP)
Good day,
I have a simulation of 3D crack in Ansys Workbench 12.1 and I need to calculate Stress Intensity Factors. I used command CINT and my results looked good (expected numbers, extremes in assumed places etc.), until I saw the same simulation with only one difference. The other simulation was made in older version of Ansys and with use of KCALC command instead of CINT calculation. But the results were different! Main problem was that in my simulation, K2 and K3 extremes were almost the same, but in older simulation they K3 was twice as K2. In Ansys help I read that KCALC uses displacement extrapolation and CINT uses contour integral calculation, but I think they should show the same results if they are applied on the same model with same conditions.
Any idea where should be problem? It would help me much beacouse I found nothing on internet or in Ansys help manual.
Thanks everyone.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

White Paper: Agile Product Engineering and Improved Product Outcomes
Today’s product development cycle is fraught with difficulties. Increased demands for complex functionality and reduced product development windows cause engineering teams to borrow practices from the IT industry, swapping outdated serial workflows for a more flexible and collaborative design method known as Agile Product Engineering. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close