INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

additional rebar for lateral loads

additional rebar for lateral loads

additional rebar for lateral loads

(OP)
is it possible to design a column in a concrete moment frame by just designing it with Dead load and live load then just add rebars at column-beam joints for lateral loads, i.e. seismic loads? why or why not?

RE: additional rebar for lateral loads

You design joints and members for the worst load combination for that particular joint or member.  These load combinations include all the forces you have described, plus others, and need to be combined, not separated, and multiplied by their appropriate load factors to get the correct design figures.  

Unless you are doing an unfactored design, such as WSD, why would you want to do it differently?

Mike McCann
MMC Engineering

 

RE: additional rebar for lateral loads

(OP)
hello, i dont think you got my question. but of course you need to design with the worst load combinations. if you are going to checkout the effect of lateral loads to a moment frame, you will notice that moments will be maximum at the top and also at the bottom of the columns. at the middle you will see that there is minimal moment since there will be your point of inflection. my question is, why not just add rebars at the column ends? making your rebars continuous from top to bottom is a waste since moments at the middle will be minimal.  

RE: additional rebar for lateral loads

It is much more difficult and cumbersome to do partial height bars in columns - takes more coordination and labor to tie the special bars.  The small cost savings you would gain with partial bars would be more than offset in extra labor $$.

 

RE: additional rebar for lateral loads

And adding to JAE's reply; by the time development length is taken into account the length that can be omitted would be relatively short.

RE: additional rebar for lateral loads

(OP)
but is it acceptable? that style of design?

RE: additional rebar for lateral loads

It is reinforced concrete design.  If the reinforcement is in the right place and developed, it is acceptable.

But design is not just about forces and stresses.  It is about practicality of construction, so your suggestion has little merit.

There are a lot of traps for young players in designing the joints in concrete moment frames.  For that reason, most of us old players avoid moment frames.

RE: additional rebar for lateral loads

(OP)
very well said. thanks hokie.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources