INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Geotechnical Bore Holes

Geotechnical Bore Holes

Geotechnical Bore Holes

(OP)
This may seem like a basic question, but I would like to get some information on the standard procedures for backfilling bore holes after the completion of the drilling. This is with respect to holes completed for foundation design, which are immediately filled after the test is complete. Are there standards or regulations that apply? We are having drilling done in a public area, and want to ensure that this procedure is done correctly.

RE: Geotechnical Bore Holes

Dear Walter2992,

I used to work for SI company in Bahrain. Whenever we completed the boreholes, it was a mandatory to grout the holes using cement grout (mixture cement and water only). This is prescribed by the Water Resources Directorate (WRD) to maintain the aquifer. What we did, 1 bag of cement was mixed with 1 big drum of water and the mixture was pumped from the bottom of the borehole till it reached the ground surface. May this help you.

Regards,

Rendang71  

RE: Geotechnical Bore Holes

whatever method you use in a public space, be sure to return to the site and perform maintenance as the backfill will settle over time.  I'd stop by weekly for at least a month to make sure there are no trip hazzards or such.

Grouting is a good idea, but no guarantee that the grout won't settle in the hours after placement (i.e., as you are driving home).

f-d

¡papá gordo ain't no madre flaca!

RE: Geotechnical Bore Holes

My presciption for backfilling boreholes in public space roadway areas:

Backfill with cuttings up to -3 feet.  
Mix two bags of Sacrete and pour in to hole up to -3"
Come back later and pound in cold patch.

Many deep, sloppy holes filled in DC by this method.  No settlement.

RE: Geotechnical Bore Holes

Depends on the specific purpose.  Most of the projects I'm involved in are in areas where the water table is near surface.  Typically, I prescribe backfill with cuttings to -3m, then bentonite chips to surface.

In cases where the borehole is collapsing/flowing, I've even grouted to surface, using a bentonite grout.

RE: Geotechnical Bore Holes

Most state environmental agencies have requirements for abandoning/closing of water wells.  This often includes geotechnical boreholes.  Check with them and the municipality that may have jurisdiction.  Most holes must be grouted closed and reported as such by the driller.  Failure to do so is a violation of state law.

Please protect the environment as much as possible.

Cheers
cheers

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources