INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

TEG Unit Evaluation

TEG Unit Evaluation

TEG Unit Evaluation

(OP)
G'day everyone

I have got a task to evaluate suitability of an existing TEG Glycol Dehydration Unit for another service/location. The basic design information for the existing unit is as shown below:

TEG purity: 99.75% weight
Max Circulation rate: 4.87 m3/h
Packing type: Sulzer Mellapak 250Y
Packing height: 5,040 mm
Max Capacity of Contactor: 9,360 actual m3/h
Max Reboiler duty: 450 kW

Now, there are two possible locations for this unit and the inlet gas conditions are as follows:

Location 1

Flow: 5,450 actual m3/h
Operating pressure: 13 barg
Inlet gas dew point: 20 degC
Outlet gas dew point spec: -32 degC
Inlet gas water content: 1,350 mg/Sm3
Outlet gas water content: 40 mg/Sm3
Available TEG/H2O rate: > 40 kg TEG / kg water absorbed


Location 2

Flow: 5,570 actual m3/h
Operating pressure: 35 barg
Inlet gas dew point: 35 degC
Outlet gas dew point spec: -18 degC
Inlet gas water content: 1,350 mg/Sm3
Outlet gas water content: 40 mg/Sm3
Available TEG/H2O rate: 20 kg TEG / kg water absorbed

I have been using GPSA Databook and Shell DEP in order to evaluate suitability of this unit for the two locations/services, and it appears that everything is OK.

Do you have any hints, or suggestions what sort of further checks I need to make?
Apart from Contactor/Regenerator, all other equipment items are 100% verified as suitable.
 

http://antwrp.gsfc.nasa.gov/apod/astropix.html

RE: TEG Unit Evaluation

Build a simulation to see if it verifies design?  Shell's DEP's are fairly well done, but a simulation is always a good check.

RE: TEG Unit Evaluation

I don't believe the existing case, there isn't enough heat input, Unless there is something really special with the TEG regeneration syste, I get you need 600 kw.

Next, you have 3 times as many moles/hr in the new case of wet gas with the same water content, therfore you want to remove more water.  That means you need even more energy and without detailed packing simulations, I doubt you have enough packing height.

RE: TEG Unit Evaluation

(OP)
@ maddocks:

Thank you for your reply. I am not sure how HYSYS can be accurate for these cases that are "on the edge", and how much I can rely on them. The risk of approving the Unit that might not be suitable is quite high when compared to looking for a grassroot solution.

@ dcasto:

Dcasto, the feed gas in the original case is not saturated at given process conditions. Moisture content is 400 mg/Sm3. That is why I believe you've got misleading results.

The second case id 100% saturated gas @ 13 barg and 20 degC. The third case is the same gas (including additional source gas) but compressed to 35 barg and 50 degC. That is why moisture content is the same.

I wonder which standards/software you use for estimating reboiler duty because I see this item as the most critical one in my calculations done so far.
 

http://antwrp.gsfc.nasa.gov/apod/astropix.html

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources