INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete Embedded Lifting Anchor Design

Concrete Embedded Lifting Anchor Design

Concrete Embedded Lifting Anchor Design

(OP)
I am designing an embed for picking a precast panel. Could someone please help clarify if I am ok to design this with LRFD factors or am I required to use OSHA's minimum 5:1 (or is it 4:1) FOS? I know OSHA applies to rigging, fall protection, etc., but does it apply to the design of my lifting anchorage?

Thanks

-R

RE: Concrete Embedded Lifting Anchor Design

Only if you are standing underneath it....

RE: Concrete Embedded Lifting Anchor Design

(OP)
Well played sir, well played...

RE: Concrete Embedded Lifting Anchor Design

The CPCI (Canadian Precast/Prestressed Concrete Institute) 4th Ed Manual gives the safety factors for temporary conditions, that are not as high, but in far more ordinary level. It has also detailed info on much of what ongoing with precast parts, handling and erection included.

However it is pertinent that these "ordinary" and optimized safety factors need be combined with accurate design as proper of industrial work, to be repeated a lot of times. Careless design/construction of insets, eyelets, cables on these safety factors may signify disgusting surprises. So when designing these items circumstantially be very cautious, preferably following applicable example or guide from expert people.
 

RE: Concrete Embedded Lifting Anchor Design

It's 4:1 for OSHA "withstand 5x design load" so failure is acceptable at 5.1 x load. I would not go below 3:1 [should be the LRFD factor] without performing NDT on the actual steel being embeded, and personally signing the Pour-Card as the rebar inspector.  The lugs may only get used once, but it gets pretty exciting when lugs fail.

Seen it happen several times on tilt-up slabs.  Lug design was 'off' and the concrete company cast them just like the engineer drew them.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources