INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Temper domestic water or separate two systems??

Temper domestic water or separate two systems??

Temper domestic water or separate two systems??

(OP)
I have some housing buildings that I manage that have one heat source for domestic water temps and a hydronic floor heat system. When the floor heat needs more than 120 degrees F I can't turn up my heat source or I have risk of scalding with domestic water temps over 120 degrees F.
I have 2 solutions. One: separate the two systems and set domestic water at 120 , and can then set floor temps higher. Two:  install tempering valves on the domestic water to keep the domestic water at 120 degrees F.  I can actually separate them fairly easily but wanted to see if anyone has had this issue or dealt with tempering valves in domestic water situations and what issues may come with that decision.??
Thank you.

RE: Temper domestic water or separate two systems??

Tempering valves can always fail - I would go with two separate systems.  Of course - that sensor could also fail.....

RE: Temper domestic water or separate two systems??

Separating by different pumped circuits makes it easier to fix as pumps are easier to replace than mixing valves when they fail.

RE: Temper domestic water or separate two systems??

Perhaps this question really belongs in the HVAC/R part of the forum.  Any way .....

I am concerned that you are at 120 Degrees F for the in-floor radiant piping, and that you want to go even higher.  You can design in-floor jobs using 115 degrees max. - have to use proper tube specing, flow rates, etc.

Do you have a primary/secondary piping arrangement?

Can you upload a schematic?  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources