INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Epoxied wood shear wall hold down bolts

Epoxied wood shear wall hold down bolts

Epoxied wood shear wall hold down bolts

(OP)
I have a project with high shear wall uplift.  High enough that cast in hold downs such as STHD14 won't work.  I have specified HDQ8-SDS3 hold downs with 7/8" diamter rods with embed plates cast in to the footings.  The contractor wants to epoxy these instead of casting them in.  Typically we use the dimensions of the footing for the area of concrete for the ACI 318 appendix D calculations.  Does anyone give any credit for the thickened slab on top of the footing?  We are in an area where the frost depth is practically zero.  Typically there is a 10" - 12" thickened slab on top of the 10" - 12" footing.  My problem is that the proximity to the edge of the thickened slab creates a break out problem, so we embed into the footing instead of the thickened slab.  However, then we need to thicken the slab to get the epoxy bond strength to work out.  Luckily in this case the footing isn't poured yet so changing footing dimensions is not a problem.  Just wondering if anyone gives any credit for the thickened slab on top of the footing versus using only the footing dimensions when it comes to epoxy.  Sometimes the increased footing depth for epoxy versus cast in is a pretty substantial difference, 25% - 30% in some cases.

RE: Epoxied wood shear wall hold down bolts

Unless you can develop the bond between the slab and footing, such as casting both monolichically, or adding extra cage steel, I would thicken the footing.

Mike McCann
MMC Engineering

 

RE: Epoxied wood shear wall hold down bolts

Cast-in anchors will always have a higher pull-out capacity than post-installed anchors. Hopefully there is reinforcement crossing the joint between the slab and the footing, otherwise the hold down bolts would need to be anchored into the footing to achieve the required pull-out capacity.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources